共 13 条
[1]
AKKAN C, 1993, THESIS CORNELL U US
[2]
SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP
[J].
MANAGEMENT SCIENCE,
1984, 30 (09)
:1093-1104
[4]
CONWAY RW, 1991, ANN M PROD OP MAN SO
[5]
CONWAY RW, 1993, PRS PRODUCTION RESER
[6]
Conway RW., 1967, THEORY SCHEDULING
[7]
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[10]
JOB SHOP SCHEDULING WITH DUE DATES AND OVERTIME CAPABILITY
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1974, 21 (01)
:68-78