SEQUENCING RULES AND DUE-DATE ASSIGNMENTS IN A JOB SHOP

被引:330
作者
BAKER, KR
机构
关键词
D O I
10.1287/mnsc.30.9.1093
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
23
引用
收藏
页码:1093 / 1104
页数:12
相关论文
共 23 条
[1]  
Baker K.R., 1983, J OPERATIONS MANAGEM, V4, P11
[2]  
Baker K. R., 1981, J OPER MANAGE, V1, P109
[3]  
Baker K.R., 1982, J OPER MANAGE, V3, P37
[4]   THE EFFECT OF WORKLOAD DEPENDENT DUE-DATES ON JOB SHOP PERFORMANCE [J].
BERTRAND, JWM .
MANAGEMENT SCIENCE, 1983, 29 (07) :799-816
[5]  
BITRAN GR, 1982, UNPUB SIMULATION MOD
[6]  
CARROLL DC, 1965, THESIS MIT
[7]  
Conway R, 1967, THEORY SCHEDULING
[8]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P228
[9]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P123
[10]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596