THE EFFECT OF WORKLOAD DEPENDENT DUE-DATES ON JOB SHOP PERFORMANCE

被引:97
作者
BERTRAND, JWM
机构
关键词
D O I
10.1287/mnsc.29.7.799
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:799 / 816
页数:18
相关论文
共 11 条
[1]   COMPARISON OF CAPACITY PLANNING TECHNIQUES IN A JOB SHOP CONTROL-SYSTEM [J].
ADAM, N ;
SURKIS, J .
MANAGEMENT SCIENCE, 1977, 23 (09) :1011-1015
[2]  
Adam N. R., 1978, 10th Annual Conference of the American Institute for Decision Sciences, P79
[3]  
BEEKMAN PR, 1977, THESIS EINDHOVEN U T
[4]  
Bertrand J., 1981, PRODUCTION CONTROL I
[5]  
Conway R, 1967, THEORY SCHEDULING
[6]   SOME TACTICAL PROBLEMS IN DIGITAL-SIMULATION [J].
CONWAY, RW .
MANAGEMENT SCIENCE, 1963, 10 (01) :47-61
[7]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[8]   ESTIMATING SAMPLE SIZE IN COMPUTING SIMULATION EXPERIMENTS [J].
FISHMAN, GS .
MANAGEMENT SCIENCE SERIES A-THEORY, 1971, 18 (01) :21-38
[9]   DUE-DATES AND INSTANTANEOUS LOAD IN ONE-MACHINE SHOP [J].
HEARD, EL .
MANAGEMENT SCIENCE, 1976, 23 (04) :444-450
[10]   ECONOMIC EVALUATION OF JOB SHOP DISPATCHING RULES [J].
JONES, CH .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (03) :293-307