A RANDOM ACTIVITY NETWORK GENERATOR

被引:38
作者
DEMEULEMEESTER, E [1 ]
DODIN, B [1 ]
HERROELEN, W [1 ]
机构
[1] UNIV CALIF RIVERSIDE,GRAD SCH MANAGEMENT,RIVERSIDE,CA 92521
关键词
D O I
10.1287/opre.41.5.972
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Exact and heuristic procedures are often developed to obtain optimal and near-optimal solutions to decision problems modeled as activity networks. Testing the accuracy and efficiency of these procedures requires the use of activity networks with various sizes, structures and parameters. The size of the network is determined by its number of nodes and arcs, where the structure is chosen from the set of all structures for the specified network size. The network parameters depend on the nature of the decision problem. Often, it is desirable for test problems to be generated at random from the space of all feasible networks. This paper deals with the problem of generating the size and structure of the network at random from the space of all feasible networks. It develops a theory which guarantees the randomness of the network structure. The theory is the basis for two methods. One can be used to generate dense networks, where the other is used to generate nondense networks. The methods, which are practical and easy to use, have been programmed for use on mainframe or personal computers. CPU time requirements are negligible. Copies of the computer program can be obtained from the authors.
引用
收藏
页码:972 / 980
页数:9
相关论文
共 13 条
[1]  
ADLAKHA VG, 1989, INFOR, V27, P272
[2]  
ALVAREZVALDES R, 1988, 1ST INT WORKSH PROJ
[3]   PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS - A BRANCH AND BOUND APPROACH [J].
CHRISTOFIDES, N ;
ALVAREZVALDES, R ;
TAMARIT, JM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (03) :262-273
[4]   BOUNDING THE PROJECT COMPLETION-TIME DISTRIBUTION IN PERT NETWORKS [J].
DODIN, B .
OPERATIONS RESEARCH, 1985, 33 (04) :862-881
[5]  
DODIN BM, 1980, OR153 N CAR STAT U O
[6]   ON THE MEASUREMENT OF COMPLEXITY IN ACTIVITY NETWORKS [J].
ELMAGHRABY, SE ;
HERROELEN, WS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1980, 5 (04) :223-234
[7]  
HERROELEN WS, 1979, 7906 CATH U LEUV DEP
[8]   BOUNDING DISTRIBUTIONS FOR A STOCHASTIC ACYCLIC NETWORK [J].
KLEINDORFER, GB .
OPERATIONS RESEARCH, 1971, 19 (07) :1586-+
[9]   NETGEN - PROGRAM FOR GENERATING LARGE-SCALE CAPACITATED ASSIGNMENT, TRANSPORTATION, AND MINIMUM COST FLOW NETWORK PROBLEMS [J].
KLINGMAN, D ;
NAPIER, A ;
STUTZ, J .
MANAGEMENT SCIENCE SERIES A-THEORY, 1974, 20 (05) :814-821
[10]   MULTI-PROJECT SCHEDULING - CATEGORIZATION OF HEURISTIC RULES PERFORMANCE [J].
KURTULUS, I ;
DAVIS, EW .
MANAGEMENT SCIENCE, 1982, 28 (02) :161-172