BOUNDING THE PROJECT COMPLETION-TIME DISTRIBUTION IN PERT NETWORKS

被引:109
作者
DODIN, B
机构
关键词
D O I
10.1287/opre.33.4.862
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:862 / 881
页数:20
相关论文
共 19 条
[1]   CONDITIONAL MONTE CARLO - SIMULATION TECHNIQUE FOR STOCHASTIC NETWORK ANALYSIS [J].
BURT, JM ;
GARMAN, MB .
MANAGEMENT SCIENCE SERIES A-THEORY, 1971, 18 (03) :207-217
[2]   MODIFICATION OF FULKERSONS PERT ALGORITHM [J].
CLINGEN, CT .
OPERATIONS RESEARCH, 1964, 12 (04) :629-&
[3]  
DEVROYE LP, 1980, MATH OPER RES, V4, P441
[4]  
DODIN BM, 1985, COMPUT OPNS RES, V12
[5]  
DODIN BM, 1985, OMEGA, V13
[6]  
Elmaghraby SE, 1967, MANAGE SCI, V13, P299, DOI DOI 10.1287/MNSC.13.5.299
[7]  
ELMAGHRABY SE, 1977, ACTIVITY NETWORKS PR
[8]   ASSOCIATION OF RANDOM VARIABLES WITH APPLICATIONS [J].
ESARY, JD ;
PROSCHAN, F ;
WALKUP, DW .
ANNALS OF MATHEMATICAL STATISTICS, 1967, 38 (05) :1466-&
[9]   EXPECTED CRITICAL PATH LENGTHS IN PERT NETWORKS [J].
FULKERSON, DR .
OPERATIONS RESEARCH, 1962, 10 (06) :808-817
[10]  
Hartley H.O., 1996, MANAGE SCI, V12, pB391, DOI 10.1287/mnsc.12.10.B469