A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING

被引:437
作者
UZSOY, R [1 ]
LEE, CY
MARTINVEGA, LA
机构
[1] PURDUE UNIV, SCH IND ENGN, W LAFAYETTE, IN 47907 USA
[2] UNIV FLORIDA, DEPT IND & SYST ENGN, GAINESVILLE, FL 32611 USA
[3] NATL SCI FDN, WASHINGTON, DC 20550 USA
基金
美国国家科学基金会;
关键词
D O I
10.1080/07408179208964233
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Although the national importance of the semiconductor industry is widely acknowledged, it is only recently that the production planning and scheduling problems encountered in this environment have begun to be addressed using industrial engineering and operations research techniques. These problems have several features that make them difficult and challenging: random yields and rework, complex product flows, and rapidly changing products and technologies. Hence their solution will contribute considerably to the theory and practice of production planning and control. In a two-part project we present a review of research in this area to date, discuss the applicability of the various approaches and suggest directions for future research. In this paper, Part I, we describe the characteristics of the semiconductor manufacturing environment and review models related to performance evaluation and production planning. Part II will review research on shop-floor control in this industry to date.
引用
收藏
页码:47 / 60
页数:14
相关论文
共 76 条
[21]   MANUFACTURING CAPACITY AND ITS MEASUREMENT - A CRITICAL-EVALUATION [J].
ELMAGHRABY, SE .
COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (07) :615-627
[22]  
FISHER J, 1992, J COST MANAGEMEN SPR, P31
[23]  
FOWLER JW, 1990, T91016 SEM RES CORP
[24]   SHORT-TERM PRODUCTION SCHEDULING OF AN AUTOMATED MANUFACTURING FACILITY [J].
GERSHWIN, SB ;
AKELLA, R ;
CHOONG, YF .
IBM JOURNAL OF RESEARCH AND DEVELOPMENT, 1985, 29 (04) :392-400
[25]  
GERSHWIN SB, 1991, COMMUNICATION MAY
[26]   CLOSED-LOOP JOB RELEASE CONTROL FOR VLSI CIRCUIT MANUFACTURING [J].
GLASSEY, CR ;
RESENDE, MGC .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1988, 1 (01) :36-46
[27]   A SCHEDULING RULE FOR JOB RELEASE IN SEMICONDUCTOR FABRICATION [J].
GLASSEY, CR ;
RESENDE, MGC .
OPERATIONS RESEARCH LETTERS, 1988, 7 (05) :213-217
[28]  
GLASSEY CR, 1989, ESRC8923 U CAL RES R
[29]  
GLASSEY CR, 1989, ESRC8924 US CAL RES
[30]  
GOLOVIN JJ, 1986, SOLID STATE TECHNOL, V29, P167