Structuring a delay and disruption claim: An application of cause-mapping and system dynamics

被引:81
作者
Williams, T [1 ]
Ackermann, F [1 ]
Eden, C [1 ]
机构
[1] Univ Strathclyde, Dept Management Sci, Glasgow G1 1QE, Lanark, Scotland
关键词
project management and scheduling; delay and disruption; litigation; cause mapping (structuring and analysis);
D O I
10.1016/S0377-2217(02)00372-7
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The idea of "Delay and Disruption" within projects is well-known and is often the subject of litigation claims. However, the term is ill-defined. and it is difficult to justify such claims within a legal process. This paper demonstrates a well-developed approach. which is a logical. transparent. auditable and sustainable means of presenting such a claim. It describes the format for a claim document that presents first the disruptive triggers. then using it formal qualitative model builds the case from the interacting effects of these triggers. Transformation of this model into a computer simulation and the ability to explore different scenarios provides the quantitative part of the claim document. Thus three elements are presented in the document: demonstration of causality. of responsibility and of it quantum for the claim. This process also provides additional benefits. including a high level of participant "buy-in". and the basis of a model that can be used to support the claim, (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:192 / 204
页数:13
相关论文
共 37 条
[31]  
Senge P.M., 1994, The fifth discipline fieldbook: Strategies and tools for building a better learning organization
[32]  
Turner J., 1993, Handbook of project-based management: Improving the process for achieving strategic objectives
[33]  
WEIL HB, 1990, P 1990 INT SYST DYN, P1311
[34]  
WICKWIRE JM, 1974, PUBLIC CONTRACT LAW, V7, P1
[35]   THE EFFECTS OF DESIGN CHANGES AND DELAYS ON PROJECT COSTS [J].
WILLIAMS, T ;
EDEN, C ;
ACKERMANN, F ;
TAIT, A .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (07) :809-818
[36]  
Williams T.M., 1999, International Journal of Project Management, V17, P269, DOI [DOI 10.1016/S0263-7863(98)00047-7, 10.1016/S0263-7863(98)00047-7]
[37]  
WILLIAMS TM, 1997, MANAGING RISKS PROJE, P284