The job shop scheduling problem: Conventional and new solution techniques

被引:309
作者
Blazewicz, J
Domschke, W
Pesch, E
机构
[1] UNIV BONN, INST GESSELL & WIRTSCHAFTSWISSENSCH, D-53113 BONN, GERMANY
[2] POLITECH POZNANSKA, INST INFORMAT, PL-60965 POZNAN, POLAND
[3] TH DARMSTADT, INST BETRIEBSWIRTSCHAFTSLEHRE, D-64289 DARMSTADT, GERMANY
关键词
D O I
10.1016/0377-2217(95)00362-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
[No abstract available]
引用
收藏
页码:1 / 33
页数:33
相关论文
共 222 条
[21]  
BALAS E, 1985, MATH PROGRAM STUD, V24, P179, DOI 10.1007/BFb0121051
[22]  
BALAS E, 1965, MSRR609
[23]  
BAPTISE P, 1995, P AAAI SIGMAN WORKSH
[24]  
BAPTISTE P, 1995, P 14 INT JOINT C ART
[25]  
BAPTISTE P, 1995, P 1 JOINT WORKSH ART
[26]   SCHEDULING THE GENERAL JOB-SHOP [J].
BARKER, JR ;
MCMAHON, GB .
MANAGEMENT SCIENCE, 1985, 31 (05) :594-598
[27]  
BARNES JW, 1992, P S INT SCH SYST SAN, P30
[28]  
BARNES JW, 1994, IIE T, V27
[29]  
BERTIER P, 1965, 32 SEMA
[30]  
BIERWIRTH C, 1995, OR SPEKTRUM, V17, P87, DOI 10.1007/BF01719250