A joint spare part and maintenance inspection optimisation model using the Delay-Time concept

被引:76
作者
Wang, Wenbin [1 ]
机构
[1] Univ Sci & Technol Beijing, Dongling Sch Econ & Management, Beijing, Peoples R China
关键词
Spare part; Inspection; Delay-Time; Optimisation; Renewal; Replacement; Maintenance; ITEM INVENTORY SYSTEM; OF-N SYSTEMS; PROVISIONING POLICY; BLOCK-REPLACEMENT; AGE REPLACEMENT; REPAIR CAPACITY; SIMULATION; DEMAND; LEVEL;
D O I
10.1016/j.ress.2011.07.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Spare parts and maintenance are closely related logistics activities where maintenance generates the need for spare parts. When preventive maintenance is present, it may need more spare parts at one time because of the planned preventive maintenance activities. This paper considers the joint optimisation of three decision variables, e.g., the ordering quantity, ordering interval and inspection interval. The model is constructed using the well-known Delay-Time concept where the failure process is divided into a two-stage process. The objective function is the long run expected cost per unit time in terms of the three decision variables to be optimised. Here we use a block-based inspection policy where all components are inspected at the same time regardless of the ages of the components. This creates a situation that the time to failure since the immediate previous inspection is random and has to be modelled by a distribution. This time is called the forward time and a limiting but closed form of such distribution is obtained. We develop an algorithm for the optimal solution of the decision process using a combination of analytical and enumeration approaches. The model is demonstrated by a numerical example. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1535 / 1541
页数:7
相关论文
共 36 条
[11]  
Christer AH, 1997, LECT NOTES EC MATH S, P196
[12]  
Cox DR., 1962, Metrheun's Monograph
[13]   Availability of k-out-of-N systems under block replacement sharing limited spares and repair capacity [J].
de Smidt-Destombes, Karin S. ;
van der Heijden, Matthieu C. ;
van Harten, Aart .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 107 (02) :404-421
[14]   Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems [J].
de Smidt-Destombes, Karin S. ;
van der Heijden, Matthieu C. ;
van Harten, Aart .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 118 (01) :260-268
[15]   BASE STOCK LEVEL DETERMINATION FOR HIGH COST LOW DEMAND CRITICAL REPAIRABLE SPARES [J].
DHAKAR, TS ;
SCHMIDT, CP ;
MILLER, DM .
COMPUTERS & OPERATIONS RESEARCH, 1994, 21 (04) :411-420
[16]  
FELLER M, 1965, INTRO PROBABILITY TH, V2
[17]   On systems with shared resources and optimal switching strategies [J].
Finkelstein, Maxim .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2009, 94 (08) :1358-1362
[18]   ON THE IMPLEMENTATION OF A CONTROL-BASED FORECASTING SYSTEM FOR AIRCRAFT SPARE PARTS PROCUREMENT [J].
FOOTE, BL .
IIE TRANSACTIONS, 1995, 27 (02) :210-216
[19]   Evaluation of forecasting methods for intermittent parts demand in the field of aviation: a predictive model [J].
Ghobbar, AA ;
Friend, CH .
COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (14) :2097-2114
[20]   Methodology of using delay-time analysis for a manufacturing industry [J].
Jones, B. ;
Jenkinson, I. ;
Wang, J. .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2009, 94 (01) :111-124