A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: Dispatching, scheduling, and pull

被引:141
作者
Baker, AD [1 ]
机构
[1] Univ Cincinnati, Fac Elect & Comp Engn, Cincinnati, OH 45221 USA
[2] Univ Cincinnati, Dept Comp Sci, Cincinnati, OH 45221 USA
关键词
systems and architectures; heterarchy scheduling and control; ERP; discrete optimization; heuristics; distributed artificial intelligence; agent technology; multi-agent systems;
D O I
10.1016/S0278-6125(98)80077-0
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper describes various multi-agent architectures, including the heterarchical architecture. It reviews the claimed advantages for multi-agent heterarchies and describes the types of factories that could use this architecture. It surveys the three common types of factory control algorithms: dispatching algorithms, scheduling algorithms, and pull algorithms. It then asks the question: which of these algorithms can be implemented in a multi-agent heterarchy? This paper describes how all common factory control algorithms used in industry can be implemented in a multi-agent heterarchy. It discusses how many of the algorithms that are popular in current research can be implemented in a multi-agent heterarchy, while others will require further research.
引用
收藏
页码:297 / 320
页数:24
相关论文
共 196 条
[21]  
Bruno J. L., 1974, P IFIP C, V74, P504
[22]  
Burke P., 1991, Artificial Intelligence in Engineering, V6, P106, DOI 10.1016/0954-1810(91)90034-L
[23]  
BURKE P, 1994, INTELLIGENT SCHEDULI, P309
[24]  
CHERKASSKY V, 1992, SPIE, V1710, P815
[25]  
CHRISTOFIDES N, 1976, ALGORITHMS COMPLEXIT
[26]  
CIRIANI TA, 1993, OPTIMIZATION IND MAT
[27]  
COFFMAN EG, 1978, SIAM J COMPUT, V7, P1, DOI 10.1137/0207001
[28]  
Conway RW., 1967, THEORY SCHEDULING
[29]   GENETIC NEURO-SCHEDULER FOR JOB-SHOP SCHEDULING [J].
DAGLI, CH ;
SITTISATHANCHAI, S .
COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) :267-270
[30]  
DAGLI CH, 1991, J NEURAL NETWORK SPR, P4