ENGINEERING APPLICATION OF DISCONTINUITY INFORMATION OBTAINED WITH DIGITAL CLOSE RANGE PHOTOGRAMMETRY

被引:0
作者
FENGYAN WANG College of Geoexploration Science and Technology,College of Earth Science,Jilin University,,P.R.China JIANPING CHEN College of Construction Engineering,Jilin University,,P.R.China FENGYUE SUN College of Earth Science,Jilin University,,P.R.China JINSHENG QUE North China Power Engineering(Beijing)Co.,Ltd.,,P.R.China [130026 ]
机构
关键词
ENGINEERING APPLICATION OF DISCONTINUITY INFORMATION OBTAINED WITH DIGITAL CLOSE RANGE PHOTOGRAMMETRY;
会议名称
第三届国际岩石力学与工程新进展学术会议暨城市规划与土木工程的三亚论坛
会议时间
1600-01-01
会议地点
中国海南三亚
中图分类号
TU198 [建筑工程测量及制图]
学科分类号
0816 081601
类型
摘要
<正>Discontinuity information needs to be obtained and studied in modern rock mass engineering because of its importance for rock mass stability.In light of the present situation of obtaining discontinuity information with artificial measurement of heavy labor and low efficiency,rapid obtaining and application of discontinuity information based on digital close range photogrammetry(DCRP) was studied in this paper.Rock high slope reinforcement engineering of Baolilinyu village in Guangzhou was used as research object.Firstly,discontinuity information was obtained.Secondly,the method was verified to be feasible by precision analysis and demarcation of preference clusters compared with compass measurement.Finally, stability of the slope was analyzed with stereographic projection.The study shows that the slope on the east side of the second quarry exists potential instability;the slope on the north side of the second quarry is comparatively stable;the safe slope angle of designed-slope 7c5-I-2 is 65°.Accordingly,designing standard for the slope reinforcement project is offered.
引用
收藏
页码:505 / 510
页数:6
共 1 条
[1]   THE APPLICATION OF THE MANAGEMENT SYSTEM ABOUT INFORMATION PROJECT IN TRAFFIC ENGINEERING DESIGN [C]. 
ZHANG Hua-ming China railway eryuan engineering group co.Ltd, Chengdu , .
第一届交通运输工程国际学术会议
,1600