共 8 条
[2]
Veinott A.F., 1966, MANAGE SCI, V12, P745, DOI DOI 10.1287/MNSC.12.11.745
[3]
Wagner H, 1960, NAV RES LOGIST Q, V7, P7
[7]
BACKLOGGING MODEL AND A MULTI-ECHELON MODEL OF A DYNAMIC ECONOMIC LOT SIZE PRODUCTION SYSTEM - NETWORK APPROACH
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1969, 15 (09)
:506-527
[8]
1969, OPERATIONS RESEARCH, V17, P262