共 26 条
[1]
Ackerman S.S., Even-flow, a scheduling method for reducing lateness in job shops, Management Technology, 3, pp. 20-32, (1963)
[2]
Baker K.R., The effects of input control in a simple scheduling model, Journal of Operations Management, 4, 2, pp. 99-112, (1984)
[3]
Baker K.R., Sequencing rules and due-date assignments in a job shop, Management Science, 30, 9, pp. 1093-1104, (1984)
[4]
Baker K.R., Bertrand J., An investigation of due-date assignment rules with constrained tightness, Journal of Operations Management, 1, 3, pp. 109-120, (1981)
[5]
Bechte W., Controlling manufacturing lead time and work-in-process inventory by means of load-oriented order release, American Production and Inventory Control Society 1982 Conferences Proceedings, pp. 67-72, (1982)
[6]
Bertrand J., The use of workload information to control job lateness in controlled and uncontrolled release production systems, Journal of Operations Management, 4, 2, pp. 79-92, (1983)
[7]
Blackstone J.H., Phillips D.T., Hogg G.L., A state-of-the-art survey of dispatching rules for manufacturing job shop operations, International Journal of Production Research, 20, pp. 27-45, (1982)
[8]
Buzacott J.A., The production capacity of job shops with limited storage space, International Journal of Production Research, 14, 5, pp. 597-605, (1976)
[9]
Cinlar E., Introduction to Stochastic Processes, pp. 88-89, (1975)
[10]
Fry T.D., Controlling input: The real key to shorter lead-times, The International Journal of Logistics Management, 1, 1, pp. 7-12, (1990)