MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION

被引:236
作者
BILLINGTON, PJ [1 ]
MCCLAIN, JO [1 ]
THOMAS, LJ [1 ]
机构
[1] CORNELL UNIV,GRAD SCH BUSINESS & PUBL ADM,ITHACA,NY 14853
关键词
D O I
10.1287/mnsc.29.10.1126
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:1126 / 1141
页数:16
相关论文
共 50 条
[1]  
BAHL H, 1981, 491 WORK PAP
[2]  
BAHL HC, 1980, THESIS OHIO STATE U
[3]  
BAKER KR, 1978, MANAGEMENT SCI, V24
[4]  
BELT B, 1978, PRODUCTION INVENTORY
[5]  
BELT B, 1976, PRODUCTION INVENTORY
[6]  
Berry W. L., 1979, MASTER PRODUCTION SC
[7]  
BERRY WL, 1972, PRODUCTION INVENTORY
[8]  
BIGGS JR, 1980, ACAD MANAGE REV, V5, P89, DOI DOI 10.5465/AMR.1980.4288917
[9]  
BILLINGTON P, 1979, 11TH P AM I DEC SCI
[10]  
BITRAN G, 1981, OPER RES, V29