SCHEDULING PROBLEMS WITH GENERALIZED DUE DATES

被引:67
作者
HALL, NG
机构
关键词
D O I
10.1080/07408178608975351
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:220 / 222
页数:3
相关论文
共 10 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]  
BROWNE J, 1984, FMS MAGAZINE APR, P114
[3]  
Conway R, 1967, THEORY SCHEDULING
[4]  
Garey MR., 1979, COMPUTERS INTRACTABI
[5]  
Karp R. M., 1972, COMPLEXITY COMPUTER, P85
[6]  
Lawler E., 1982, P PART NATO ADV STUD, V84, P35
[7]  
Lenstra J.K., 1977, ANN DISCRETE MATH, V1, P343, DOI [/10.1016/S0167-5060(08)70743-X, DOI 10.1016/S0167-5060(08)70743-X, 10.1016/S0167-5060(08)70743-X]
[8]   N JOB, ONE MACHINE SEQUENCING ALGORITHM FOR MINIMIZING THE NUMBER OF LATE JOBS [J].
MOORE, JM .
MANAGEMENT SCIENCE, 1968, 15 (01) :102-109
[9]  
Papadimitriou C. H., 1998, COMBINATORIAL OPTIMI
[10]   LOADING AND CONTROL POLICIES FOR A FLEXIBLE MANUFACTURING SYSTEM [J].
STECKE, KE ;
SOLBERG, JJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1981, 19 (05) :481-490