Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods

被引:305
作者
Amiri, Morteza Pakdin
机构
[1] Department of Accounting and Industrial Management, Membership of Young Researchers Club, I.A.U. Babol Branch
关键词
Project selection; AHP; Fuzzy TOPSIS; Decision-maker; Criteria; HIERARCHY PROCESS AHP; DECISION-MAKING; MODEL; RANKING; QUALITY; DESIGN;
D O I
10.1016/j.eswa.2010.02.103
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The evaluation and selection of projects before investment decision is customarily done using, technical and information. In this paper, proposed a new methodology to provide a simple approach to assess alternative projects and help the decision-maker to select the best one for National Iranian Oil Company by using six criteria of comparing investment alternatives as criteria in an AHP and fuzzy TOPSIS techniques. The AHP is used to analyze the structure of the project selection problem and to determine weights of the criteria, and fuzzy TOPSIS method is used to obtain final ranking. This application is conducted to illustrate the utilization of the model for the project selection problems. Additionally, in the application, it is shown that calculation of the criteria weights is important in fuzzy TOPSIS method and they could change the ranking. The decision-maker can use these different weight combinations in the decision-making process according to priority. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:6218 / 6224
页数:7
相关论文
共 39 条
[1]   Using analytic hierarchy process (AHP) to improve human performance: An application of multiple criteria decision making problem [J].
Albayrak, E ;
Erensal, YC .
JOURNAL OF INTELLIGENT MANUFACTURING, 2004, 15 (04) :491-503
[2]  
Amiri Alireza Pakdin, 2009, Journal of Applied Sciences, V9, P258, DOI 10.3923/jas.2009.258.267
[3]  
[Anonymous], 1996, FUZZY SETS THEORY IT
[4]   A fuzzy AHP approach to evaluating machine tool alternatives [J].
Ayag, Z ;
Özdemir, RG .
JOURNAL OF INTELLIGENT MANUFACTURING, 2006, 17 (02) :179-190
[5]   A combined AHP-GP model for quality control systems [J].
Badri, MA .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 72 (01) :27-40
[6]   RECENT ADVANCES IN R AND D BENEFIT MEASUREMENT AND PROJECT SELECTION METHODS [J].
BAKER, N ;
FREELAND, J .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (10) :1164-1175
[7]   Selection of the strategic alliance partner in logistics value chain [J].
Bueyuekoezkan, Guelcin ;
Feyzioglu, Orhan ;
Nebol, Erdal .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 113 (01) :148-158
[8]   Global supplier development considering risk factors using fuzzy extended AHP-based approach [J].
Chan, Felix T. S. ;
Kumar, Niraj .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (04) :417-431
[9]   A survey analysis of service quality for domestic airlines [J].
Chang, YH ;
Yeh, CH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 139 (01) :166-177
[10]   A survey and optimization-based evaluation of development strategies for the air cargo industry [J].
Chang, Yu-Hern ;
Yeh, Chung-Hsing ;
Wang, Shih-Yi .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 106 (02) :550-562