Coping with uncertainties in integrated urban water management

被引:4
作者
Geldof, GD [1 ]
机构
[1] Tauw Water, NL-7400 AV Deventer, Netherlands
关键词
complexity; end-of-pipe approach; integrated water management; stormwater; source control; uncertainties;
D O I
10.2166/wst.1997.0677
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In the practice of integrated water management we meet complexity, subjectivity and uncertainties. Uncertainties come into play when new urban water management techniques are applied. The art of a good design is not to reduce uncertainties as much as possible, but to find the middle course between cowardice and recklessness. This golden mean represents bravery. An interdisciplinary approach is needed to reach consensus. Calculating uncertainties by using Monte Carlo simulation results may be helpful. (C) 1997 IAWQ. Published by Elsevier Science Ltd.
引用
收藏
页码:265 / 269
页数:5
相关论文
共 6 条
[1]  
Cohen J., 1994, The collapse of chaos: Discovering simplicity in a complex world
[2]  
GAILBRAIGHT J, 1973, DESIGNING COMPLEX OR
[5]  
LAMBRECHTS ACW, 1995, LEIDRAAD AAN AFKOPPE
[6]  
STEVENS EW, 1993, P 6 INT C URB STORM