Robust process planning under uncertainty

被引:163
作者
Ahmed, S
Sahinidis, NV
机构
[1] Univ Illinois, Dept Chem Engn, Urbana, IL 61801 USA
[2] Univ Illinois, Dept Mech & Ind Engn, Urbana, IL 61801 USA
关键词
D O I
10.1021/ie970694t
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The need to model uncertainty in process design and operations has long been recognized. A frequently taken approach, the two-stage paradigm, involves partitioning the problem variables into two stages: those that have to be decided before and those that can be decided after the uncertain parameters reveal themselves. The resulting two-stage stochastic optimization models minimize the sum of the costs of the first stage and the expected cost of the second stage. A potential limitation of this approach is that it does not account for the variability of the second-stage costs and might lead to solutions where the actual second-stage costs are unacceptably high. In order to resolve this difficulty, we introduce a robustness measure that penalizes second-stage costs that are above the expected cost. Incorporating this measure into stochastic programming formulations does not introduce nonlinearlities, thus making possible the solution of large-scale problems through linear programming techniques. The proposed framework is applied to the planning of chemical process networks for which we propose a number of specialized models and solution schemes.
引用
收藏
页码:1883 / 1892
页数:10
相关论文
共 25 条
[1]  
AHMED S, 1997, THESIS U ILLINOIS UR
[2]  
AHMED S, 1998, IN PRESS COMPUTER AI
[3]  
[Anonymous], 1988, GAMS USERS GUIDE
[4]  
AVRIEL M, 1969, IND ENG CHEM PROC DD, V32, P124
[5]   A disaggregation algorithm for the optimization of stochastic planning models [J].
Clay, RL ;
Grossmann, IE .
COMPUTERS & CHEMICAL ENGINEERING, 1997, 21 (07) :751-774
[6]   A SCENARIO APPROACH TO CAPACITY PLANNING [J].
EPPEN, GD ;
MARTIN, RK ;
SCHRAGE, L .
OPERATIONS RESEARCH, 1989, 37 (04) :517-527
[7]  
Escudero L. F., 1993, Annals of Operations Research, V43, P311
[8]   OPTIMUM DESIGN OF CHEMICAL-PLANTS WITH UNCERTAIN PARAMETERS [J].
GROSSMANN, IE ;
SARGENT, RWH .
AICHE JOURNAL, 1978, 24 (06) :1021-1028
[9]  
GROSSMANN IE, 1983, 2 INT C FDN COMP AID
[10]  
*IBM CORP, 1991, OPT SUBR LIB GUID RE