An approach for estimating the end-of-life product disassembly effort and cost

被引:139
作者
Das, SK [1 ]
Yedlarajiah, P [1 ]
Narendra, R [1 ]
机构
[1] New Jersey Inst Technol, Dept Ind & Mfg Engn, Newark, NJ 07102 USA
关键词
D O I
10.1080/002075400189356
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Disassembly is the process of physically separating a product into its parts or subassembly pieces. The overall economics of the disassembly process, and in particular the cost to disassemble, is still not well understood. In this paper our goal is to introduce a methodology that will support and facilitate the economic analysis of the disassembly activity. We present a multi-factor model to compute the disassembly effort index (DEI) score, which is representative of the total operating cost to disassemble a product. The DEI score can then be compared against the projected market value of the disassembled parts and subassemblies to get an economic measure. To develop the DEI model we surveyed a variety of commercial disassembly facilities. Based on these surveys we propose a multifactor weighted estimation scheme. The seven factors are (i) time, (ii) tools, (iii) fixture, (iv) access, (v) instruct, (vi) hazard, and (vii) force requirements. The DEI scale is defined in the 0 to 100 range. This range is assigned on a weighted basis to each of the seven factors. For each factor, an independent utility scale is formulated, using the assigned range as anchors. Using a conversion scale the DEI score is used to derive an estimate of disassembly cost and the disassembly return on investment. An example is presented.
引用
收藏
页码:657 / 673
页数:17
相关论文
共 19 条
[1]  
BOOTHROYD G, 1987, PRODUCT DESIGN ASSEB
[2]  
CARNAHAN J, 1998, J IND ECOL, V2, P79, DOI DOI 10.1162/JIEC.1998.2.1.79
[3]   Characterization of material outputs from an electronics demanufacturing facility [J].
Das, SK ;
Matthew, S .
PROCEEDINGS OF THE 1999 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS AND THE ENVIRONMENT, ISEE - 1999, 1999, :251-256
[4]  
DOWIE T, 1994, UNPUB ESTIMATION DIS
[5]   An evaluation methodology for disassembly processes [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (1-2) :329-332
[6]  
John-Steiner V., 1995, MIND CULT ACT, V2, P2, DOI DOI 10.1080/10749039509524680
[7]  
Kroll E, 1996, IIE TRANS, V28, P837
[8]   Application of work-measurement analysis to product disassembly for recycling [J].
Kroll, E .
CONCURRENT ENGINEERING-RESEARCH AND APPLICATIONS, 1996, 4 (02) :149-158
[9]   Optimal disassembly of complex products [J].
Lambert, AJD .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (09) :2509-2523
[10]  
LOW MK, 1998, IEEE T COMPONENTS PA, V21, P410