New product warranty: A literature review

被引:272
作者
Murthy, DNP [1 ]
Djamaludin, I
机构
[1] Univ Queensland, Dept Mech Engn, St Lucia, Qld 4072, Australia
[2] Norwegian Univ Sci & Technol, Dept Qual & Prod Engn, N-7034 Trondheim, Norway
关键词
new products; product warranty; manufacturing; management;
D O I
10.1016/S0925-5273(02)00153-6
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Warranty is an important element of marketing new products as better warranty signals higher product quality and provides greater assurance to customers. Servicing warranty involves additional costs to the manufacturer and this cost depends on product reliability and warranty terms. Product reliability is influenced by the decisions made during the design and manufacturing of the product. As such warranty is very important in the context of new products. Product warranty has received the attention of researchers from many different disciplines and the literature on warranties is vast. This paper carries out a review of the literature that has appeared in the last ten years. It highlights issues of interest to manufacturers in the context of managing new products from an overall business perspective. (C) 2002 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:231 / 260
页数:30
相关论文
共 193 条
[1]   PERFORMANCE EVALUATION OF SERVICE TERRITORIES [J].
AGNIHOTHRI, SR ;
KARMARKAR, US .
OPERATIONS RESEARCH, 1992, 40 (02) :355-366
[2]   The relationship between warranty and product reliability [J].
Agrawal, J ;
Richardson, PS ;
Grimm, PE .
JOURNAL OF CONSUMER AFFAIRS, 1996, 30 (02) :421-443
[3]  
Ahn CW, 1998, J QUAL TECHNOL, V30, P127
[4]   REPUTATION, PRODUCT QUALITY, AND WARRANTIES [J].
Al-Najjar, Nabil Ibraheem .
JOURNAL OF ECONOMICS & MANAGEMENT STRATEGY, 1994, 3 (04) :605-637
[5]  
[Anonymous], P ANN REL MAIN S 199
[6]  
[Anonymous], WARRANTIES PLANNING
[7]  
[Anonymous], THESIS U QUEENSLAND
[8]   BANKRUPTCY, WARRANTIES AND THE FIRMS CAPITAL STRUCTURE [J].
APPELBAUM, E .
INTERNATIONAL ECONOMIC REVIEW, 1992, 33 (02) :399-412
[9]   Service contracts: A stochastic model [J].
Ashgarizadeh, E ;
Murthy, DNP .
MATHEMATICAL AND COMPUTER MODELLING, 2000, 31 (10-12) :11-20
[10]   REPLACEMENT COSTS UNDER WARRANTY - COST MOMENTS AND TIME VARIABILITY [J].
BALCER, Y ;
SAHIN, I .
OPERATIONS RESEARCH, 1986, 34 (04) :554-559