An agent-based approach for e-manufacturing and supply chain integration

被引:43
作者
Zhang, David Zhengwen [1 ]
Anosike, Anthony Ikechukwu [1 ]
Lim, Ming Kim [1 ]
Akanle, Oluwaremilekun Mowanuola [1 ]
机构
[1] Univ Exeter, Sch Engn, Exeter EX4 4QF, Devon, England
关键词
supply chain integration; multi-agent system; agile manufacturing; e-manufacturing;
D O I
10.1016/j.cie.2006.02.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A major problem facing manufacturing organisations is how to provide efficient and cost-effective responses to the unpredictable changes taking place in a global market. This problem is made difficult by the complexity of supply chain networks coupled with the complexity of individual manufacturing systems within supply chains. Current systems such as manufacturing execution systems (MES), supply chain management (SCM) systems and enterprise resource planning (ERP) systems do not provide adequate facilities for addressing this problem. This paper presents an approach that would enable manufacturing organisations to dynamically and cost-effectively integrate, optimise, configure, simulate, restructure and control not only their own manufacturing systems but also their supply networks, in a co-ordinated manner to cope with the dynamic changes occurring in a global market. This is realised by a synergy of two emerging manufacturing concepts: Agent-based agile manufacturing systems and e-manufacturing. The concept is to represent a complex manufacturing system and its supply network with an agent-based modelling and simulation architecture and to dynamically generate alternative scenarios with respect to planning, scheduling, configuration and restructure of both the manufacturing system and its supply network based on the coordinated interactions amongst agents. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:343 / 360
页数:18
相关论文
共 26 条
[1]  
Baker A.D., 1997, TR2080897 ECECS DEP
[2]  
BO X, 2003, 2003 AM CONTR C DEV
[3]  
BURBIDGE JL, 1971, PRODUCTION PLANNING
[4]  
Chopra S., 2001, SUPPLY CHAIN MANAGEM
[5]  
Choy K. L., 2002, PORTL INT C MAN ENG
[6]   REAL-TIME DISTRIBUTED SCHEDULING OF HETERARCHICAL MANUFACTURING SYSTEMS [J].
DUFFIE, NA ;
PRABHU, VV .
JOURNAL OF MANUFACTURING SYSTEMS, 1994, 13 (02) :94-107
[7]  
Finin T., 1994, P 3 INT C INF KNOWL
[8]   Defining the Internet-based supply chain system for mass customized markets [J].
Ghiassi, M ;
Spera, C .
COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (01) :17-41
[9]   Multilayer laser cladding of metal powders for fast prototyping [J].
Jendrzejewski, R ;
Klimczuk, T ;
Sadowski, W ;
Sliwinski, G .
TENTH INTERNATIONAL SCHOOL ON QUANTUM ELECTRONICS: LASER PHYSICS AND APPLICATIONS, 1999, 3571 :383-387
[10]   Application of information technology to a virtual enterprise broker: The case of Bill Epstein [J].
Kanet, JJ ;
Faisst, W ;
Mertens, P .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 62 (1-2) :23-32