A Supply Chain Disturbances Classification

被引:7
作者
Barroso, Ana P. [1 ]
Machado, Virginia H. [1 ]
Machado, V. Cruz [1 ]
机构
[1] Univ Nova Lisboa, Fac Sci & Technol, UNIDEMI, P-1200 Lisbon, Portugal
来源
IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3 | 2008年
关键词
Disturbance; resilience; supply chain; uncertainty; RISK-MANAGEMENT; UNCERTAINTY;
D O I
10.1109/IEEM.2008.4738196
中图分类号
F [经济];
学科分类号
02 ;
摘要
Nowadays, organizations and supply chains have to deal with a number of disturbances. The pressures to grow revenues, to take advantage of new technologies, to reduce costs, and to improve working capital and streamline operational procedures, pushed many organizations to establish strategies which increase risk exposure. As a result, companies can loose the ability to act quickly and effectively in response to disturbances. In this paper, different disturbances are identified and the relationship with their potential sources is discussed. A proposal for the classification of disturbances is presented; it is considered as a required step to understand how to model for better organization performance in situations characterised by high levels of exposure to disturbances.
引用
收藏
页码:1870 / 1874
页数:5
相关论文
共 20 条
[1]  
CARVALHO H, 2007, P ENG 07 COV PORT
[2]  
Carvalho H., 2007, IIE Annual Conference. Proceedings, P186
[3]  
CARVALHO H, 2005, IIE ANN C ATL US
[4]  
Christopher M., 2004, INT J LOGIST MANAG, V15, P1, DOI [10.1108/09574090410700275, DOI 10.1108/09574090410700275]
[5]   Risk management in supply chain: a real option approach [J].
Cucchiella, Federica ;
Gastaldi, Massimo .
JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2006, 17 (06) :700-720
[6]   Robust supply chain design: A strategic approach for exception handling [J].
Gaonkar, R ;
Viswanadham, N .
2003 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS 1-3, PROCEEDINGS, 2003, :1762-1767
[7]   Correlating MRP system nervousness with forecast errors [J].
Ho, CJ ;
Ireland, TC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (08) :2285-2299
[8]  
KLEINDORFER PR, PRODUCTION OPE UNPUB
[9]   Uncertainty under MRP-planned manufacture: review and categorization [J].
Koh, SCL ;
Saad, SM ;
Jones, MH .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (10) :2399-2421
[10]  
KOH SCL, 2001, THESIS U HERTFORDSHI