A time-space network model for work team scheduling after a major disaster

被引:48
作者
Yan, Shangyao [1 ]
Shih, Yu-Lin [1 ]
机构
[1] Natl Cent Univ, Dept Civil Engn, Chungli 32054, Taiwan
关键词
emergency repair; scheduling; time-space network; integer network flow problem with side constraints;
D O I
10.1080/02533839.2007.9671231
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this research we develop a novel time-space network model with the objective of minimizing the length of time needed for emergency repair, subject to related operating constraints. The model is expected to help the decision maker to efficiently set an emergency repair schedule within a limited time. Our model is an integer network flow problem with side constraints. To efficiently solve realistically large problems in practice, we develop a heuristic algorithm. To evaluate our model and the solution algorithm, we exhibit a case study. The results show that the model and the solution algorithm could be useful in practice.
引用
收藏
页码:63 / 75
页数:13
相关论文
共 15 条
[1]  
ARDEKANI SA, 1988, TRANSPORT Q, V42, P107
[2]  
Arimura M, 1999, PROCEEDINGS OF THE EASTERN ASIA SOCIETY FOR TRANSPORTATION STUDIES, VOL 2, P55
[3]  
BROWN GG, 1993, NAV RES LOG, V40, P1, DOI 10.1002/1520-6750(199302)40:1<1::AID-NAV3220400102>3.0.CO
[4]  
2-S
[5]  
CHEN YW, 1999, INT J FUZZY SYST, V1, P85
[6]  
FENG CM, 2003, J 5 E AS SOC TRANSP
[7]   Optimized resource allocation for emergency response after earthquake disasters [J].
Fiedrich, F ;
Gehbauer, F ;
Rickers, U .
SAFETY SCIENCE, 2000, 35 (1-3) :41-57
[8]  
Garey MR, 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[9]   LESSONS IN LOGISTICS FROM SOMALIA [J].
KEMBALLCOOK, D ;
STEPHENSON, R .
DISASTERS, 1984, 8 (01) :57-66
[10]   VEHICLE SCHEDULING FOR EMERGENCY RELIEF MANAGEMENT - A KNOWLEDGE-BASED APPROACH [J].
KNOTT, RP .
DISASTERS, 1988, 12 (04) :285-293