Restricted job completion time variance minimisation on identical parallel machines

被引:14
作者
Chen, Yuerong [1 ]
Li, Xueping [1 ]
Sawhney, Rapinder [1 ]
机构
[1] Univ Tennessee, Dept Ind & Informat Engn, Knoxville, TN 37996 USA
关键词
job scheduling; completion time variance; CTV; service stability; production planning; SINGLE-MACHINE; FLOW-TIME; ALGORITHMS; SYSTEMS;
D O I
10.1504/EJIE.2009.025048
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper is concerned with scheduling a number of jobs on multiple identical parallel machines to minimise job Completion Time Variance (CTV), which is a performance measure that emphasises providing uniform service to jobs. CTV minimisation is closely related to common due date problems, service stability and the Just-in-Time (JIT) philosophy. This paper focuses on the restricted aspect of the problem, i.e., no idle times are allowed to insert before machines start to process jobs. By exploring the properties of optimal schedules, we develop a computationally efficient heuristic algorithm named Balanced Assignment, Verified Schedule (BAVS) to reduce job CTV. This paper takes into account the deterministic case in which the processing times of jobs are known in advance. Numerical results show that the BAVS algorithm is near-optimal for small-sized problem instances and outperforms some existing algorithms for large-sized problem instances. [Submitted 01 February 2008; Revised 02 July 2008; Accepted 21 October 2008]
引用
收藏
页码:261 / 276
页数:16
相关论文
共 25 条
[1]   Tabu search for a class of single-machine scheduling problems [J].
Al-Turki, U ;
Fedjki, C ;
Andijani, A .
COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (12) :1223-1230
[2]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[3]   Multi-machine scheduling with variance minimization [J].
Cai, XQ ;
Cheng, TCE .
DISCRETE APPLIED MATHEMATICS, 1998, 84 (1-3) :55-70
[4]  
Chen B., 1998, A Review of Machine Scheduling: Complexity, Algorithms and Approximability
[5]   A STATE-OF-THE-ART REVIEW OF PARALLEL-MACHINE SCHEDULING RESEARCH [J].
CHENG, TCE ;
SIN, CCS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 47 (03) :271-292
[6]   ON THE MINIMIZATION OF COMPLETION-TIME VARIANCE WITH A BICRITERIA EXTENSION [J].
DE, P ;
GHOSH, JB ;
WELLS, CE .
OPERATIONS RESEARCH, 1992, 40 (06) :1148-1155
[7]   MINIMIZING WAITING TIME VARIANCE IN SINGLE MACHINE PROBLEM [J].
EILON, S ;
CHOWDHURY, IG .
MANAGEMENT SCIENCE, 1977, 23 (06) :567-575
[8]   An ant-colony optimization algorithm for minimizing the completion-time variance of jobs in flowshops [J].
Gajpal, Y ;
Rajendran, C .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 101 (02) :259-272
[9]  
Graham R. L., 1979, Discrete Optimisation, P287
[10]   MINIMIZING FLOW TIME VARIANCE IN A SINGLE-MACHINE SYSTEM USING GENETIC ALGORITHMS [J].
GUPTA, MC ;
GUPTA, YP ;
KUMAR, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (03) :289-303