Multi-agent single machine scheduling

被引:163
作者
Agnetis, Alessandro
Pacciarelli, Dario
Pacifici, Andrea
机构
[1] Univ Siena, Dipartimento Ingn Informaz, I-53100 Siena, Italy
[2] Univ Roma Tre, Dipartimento Informat & Automaz, Rome, Italy
[3] Univ Roma Tor Vergata, Dipartimento Ingn Impresa, I-00173 Rome, Italy
[4] Univ Roma Tor Vergata, Ctr Vito Volterra, I-00173 Rome, Italy
关键词
multi-agent; scheduling; complexity; multi-criteria;
D O I
10.1007/s10479-006-0164-y
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the scheduling problems arising when several agents, each owning a set of nonpreemptive jobs, compete to perform their respective jobs on one shared processing resource. Each agent wants to minimize a certain cost function, which depends on the completion times of its jobs only. The cost functions we consider in this paper are maximum of regular functions (associated with each job), number of late jobs and total weighted completion time. The different combinations of the cost functions of each agent lead to various problems, whose computational complexity is analysed in this paper. In particular, we investigate the problem of finding schedules whose cost for each agent does not exceed a given bound for each agent.
引用
收藏
页码:3 / 15
页数:13
相关论文
共 12 条
[1]   Scheduling problems with two competing agents [J].
Agnetis, A ;
Mirchandani, PB ;
Pacciarelli, D ;
Pacifici, A .
OPERATIONS RESEARCH, 2004, 52 (02) :229-242
[2]  
[Anonymous], P AG 99 WORKSH AG BA
[3]   A competitive scheduling problem and its relevance to UMTS channel assignment [J].
Arbib, C ;
Smriglio, S .
NETWORKS, 2004, 44 (02) :132-141
[4]   A multiple-criterion model for machine scheduling [J].
Baker, KR ;
Smith, JC .
JOURNAL OF SCHEDULING, 2003, 6 (01) :7-16
[5]   A binary conflict ascending price (BICAP) mechanism for the decentralized allocation of the right to use railroad tracks [J].
Brewer, PJ ;
Plott, CR .
INTERNATIONAL JOURNAL OF INDUSTRIAL ORGANIZATION, 1996, 14 (06) :857-886
[6]  
Conway R.W., 1967, Theory of Scheduling
[7]  
Huang X, 1995, P IEEE INT C SYST MA
[8]  
KIM K, 2000, 55 CIFE STANF U
[9]   OPTIMAL SEQUENCING OF A SINGLE MACHINE SUBJECT TO PRECEDENCE CONSTRAINTS [J].
LAWLER, EL .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 19 (05) :544-546
[10]   N JOB, ONE MACHINE SEQUENCING ALGORITHM FOR MINIMIZING THE NUMBER OF LATE JOBS [J].
MOORE, JM .
MANAGEMENT SCIENCE, 1968, 15 (01) :102-109