Lot-sizing decisions under trade credit depending on the ordering quantity

被引:112
作者
Chung, KJ [1 ]
Liao, JJ [1 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
关键词
permissible delay in payments; inventory; deterioration; order quantity;
D O I
10.1016/S0305-0548(03)00043-1
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper deals with the problem of determining the economic order quantity for exponentially deteriorating items under the conditions of permissible delay in payments. The delay in payments depends on the quantity ordered. When the order quantity is less than at which the delay in payments is permitted, the payment for the product must be made immediately. Otherwise, the fixed trade credit period is permitted. Based upon the above arguments, this paper incorporates both Hwang and Shinn (Comput. Oper. Res. 24 (1997) 539) and Khouja and Mehrez (J. Manuf. Systems 15 (1996) 334) under above conditions. In addition, the objective function is modeled as a total variable cost-minimization problem. An algorithm to determine the economic order quantity is developed. Examples are solved to illustrate the results given in this paper. Finally, the results in this paper generalize some already published results. (C) 2003 Elsevier Ltd. All rights reserved.
引用
收藏
页码:909 / 928
页数:20
相关论文
共 22 条
[1]  
AGGARWAL SP, 1995, J OPER RES SOC, V46, P658, DOI 10.1057/palgrave.jors.0460509
[2]  
[Anonymous], CALCULUS ANAL GEOMET
[3]   DELAY OF PAYMENTS FOR EXTRAORDINARY PURCHASES [J].
ARCELUS, FJ ;
SRINIVASAN, G .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (08) :785-795
[4]  
BLATTBEG RC, 1990, SALES PROMOTIONS CON
[5]   An inventory model for deteriorating items with partial backlogging and permissible delay in payments [J].
Chang, HJ ;
Dye, CY .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2001, 32 (03) :345-352
[6]   Economic order quantity of deteriorating items under permissible delay in payments [J].
Chu, P ;
Chung, KJ ;
Lan, SP .
COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (10) :817-824
[7]  
CHUNG HJ, 2001, PRODUCTION PLANNING, V12, P274
[8]  
Chung K. J., 2000, OPSEARCH, V37, P267
[9]  
Chung KJ, 2001, ENG ECON, V46, P232
[10]  
Covert R. P., 1973, AIIE Transactions, V5, P323, DOI 10.1080/05695557308974918