Vertical arrangements, market structure, and competition: An analysis of restructured US electricity markets

被引:221
作者
Bushnell, James B. [1 ]
Mansur, Erin T. [2 ,3 ]
Saravia, Celeste [1 ]
机构
[1] Univ Calif Berkeley, Energy Inst, Berkeley, CA 94720 USA
[2] Yale Sch Management, New Haven, CT 06520 USA
[3] Natl Bur Econ Res, Cambridge, MA 02138 USA
关键词
D O I
10.1257/aer.98.1.237
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper examines vertical arrangements in electricity markets. Vertically integrated wholesalers, or those with long-term contracts, have less incentive to raise wholesale prices when retail prices are determined beforehand. For three restructured markets, we simulate prices that define bounds on static oligopoly equilibria. Our findings suggest that vertical arrangements dramatically affect estimated market outcomes. Had regulators impeded vertical arrangements (as in California), our simulations imply vastly higher prices than observed and production inefficiencies costing over 45 percent of those production costs with vertical arrangements. We conclude that horizontal market structure accurately predicts market performance only when accounting for vertical structure.
引用
收藏
页码:237 / 266
页数:30
相关论文
共 35 条
[1]  
ALLAZ B, 1993, J ECON THEORY, V53, P1
[2]  
[Anonymous], [No title captured]
[3]  
Borenstein S, 1999, ENERGY J, V20, P65
[4]   An empirical analysis of the potential for market power in California's electricity industry [J].
Borenstein, S ;
Bushnell, J .
JOURNAL OF INDUSTRIAL ECONOMICS, 1999, 47 (03) :285-323
[5]   Measuring market inefficiencies in California's restructured wholesale electricity market [J].
Borenstein, S ;
Bushnell, JB ;
Wolak, FA .
AMERICAN ECONOMIC REVIEW, 2002, 92 (05) :1376-1405
[6]   California's electricity crisis: a market apart? [J].
Bushnell, J .
ENERGY POLICY, 2004, 32 (09) :1045-1052
[7]   A mixed complementarity model of hydrothermal electricity competition in the western United States [J].
Bushnell, J .
OPERATIONS RESEARCH, 2003, 51 (01) :80-93
[8]   Oligopoly equilibria in electricity contract markets [J].
Bushnell, James .
JOURNAL OF REGULATORY ECONOMICS, 2007, 32 (03) :225-245
[9]  
Bushnell JB, 2002, WP101 CSEM
[10]   The NEOS Server [J].
Czyzyk, J ;
Mesnier, MP ;
More, JJ .
IEEE COMPUTATIONAL SCIENCE & ENGINEERING, 1998, 5 (03) :68-75