Last time buy and repair decisions for spare parts

被引:32
作者
Behfard, S. [1 ]
van der Heijden, M. C. [1 ]
Al Hanbali, A. [1 ]
Zijm, W. H. M. [1 ]
机构
[1] Univ Twente, Sch Management & Governance, NL-7500 AE Enschede, Netherlands
关键词
Inventory; Stochastic processes; Spare parts; Last time buy; Repair; OF-LIFE SERVICE; PRODUCTION CAPACITY; INVENTORY MODEL; ACQUISITION; POLICIES; PRODUCT; DEMAND;
D O I
10.1016/j.ejor.2015.02.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Original Equipment Manufacturers (OEM's) of advanced capital goods often offer service contracts for system support to their customers, for which spare parts are needed. Due to technological changes, suppliers of spare parts may stop production at some point in time. As a reaction to that decision, an OEM may place a so-called Last Time Buy (LTB) order to cover demand for spare parts during the remaining service period, which may last for many years. The fact that there might be other alternative sources of supply in the next periods complicates the decision on the LTB. In this paper, we develop a heuristic method to find the near-optimal LTB quantity in presence of an imperfect repair option of the failed parts that can be returned from the field. Comparison of our method to simulation shows high approximation accuracy. Numerical experiments reveal that repair is an excellent option as alternative sourcing, even if it is more expensive than buying a new part, because of the option to postpone the repair until the parts are needed. In addition, we show the impact of other key parameters on costs and LTB quantity. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:498 / 510
页数:13
相关论文
共 28 条
[1]  
Adan I., 1995, PROBAB ENG INFORM SC, V9, P623, DOI DOI 10.1017/50269964800004101
[2]   AN INVENTORY MODEL WITH LIMITED PRODUCTION CAPACITY AND UNCERTAIN DEMANDS .1. THE AVERAGE-COST CRITERION [J].
FEDERGRUEN, A ;
ZIPKIN, P .
MATHEMATICS OF OPERATIONS RESEARCH, 1986, 11 (02) :193-207
[3]  
Fortuin L., 1981, INT J OPER PROD MAN, V2, P29
[4]  
Fortuin L., 1980, International Journal of Operations \ Production Management, V1, P59
[5]   Base stock policies for production/inventory problems with uncertain capacity levels [J].
Gullu, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 105 (01) :43-51
[6]   THE STRUCTURE OF PERIODIC REVIEW POLICIES IN THE PRESENCE OF RANDOM YIELD [J].
HENIG, M ;
GERCHAK, Y .
OPERATIONS RESEARCH, 1990, 38 (04) :634-643
[7]   Forecasting service parts demand for a discontinued product [J].
Hong, Jung Sik ;
Koo, Hoon-Young ;
Lee, Chin-Seung ;
Ahn, Jaekyoung .
IIE TRANSACTIONS, 2008, 40 (07) :640-649
[8]   A non-stationary periodic review production-inventory model with uncertain production capacity and uncertain demand [J].
Iida, T .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 140 (03) :670-683
[9]   Decision support for spare parts acquisition in post product life cycle [J].
Inderfurth, Karl ;
Mukherjee, Kampan .
CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2008, 16 (01) :17-42
[10]   An Advanced Heuristic for Multiple-Option Spare Parts Procurement after End-of-Production [J].
Inderfurth, Karl ;
Kleber, Rainer .
PRODUCTION AND OPERATIONS MANAGEMENT, 2013, 22 (01) :54-70