Job flow control in assembly operations

被引:7
作者
Ayhan, H [1 ]
Wortman, MA
机构
[1] Georgia Inst Technol, Sch Ind & Syst Engn, Atlanta, GA 30332 USA
[2] Texas A&M Univ, Dept Ind Engn, College Stn, TX 77843 USA
关键词
assembly; cycle time; event graphs; job flow control; (max; algebra;
D O I
10.1109/9.754835
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, the authors develop a state variable feedback control for a class of assembly operations, The objective of this control is to increase the number of jobs completed within a time horizon T while keeping the job cycle times within an acceptable range with a prespecified probability, The assembly operations are modeled as stochastic timed-event graphs which in the (max, +) algebra are characterized by a set of linear stochastic difference equations.
引用
收藏
页码:864 / 868
页数:5
相关论文
共 16 条
[1]  
AYHAN H, IN PRESS APPROXIMATI
[2]   ACYCLIC FORK-JOIN QUEUING-NETWORKS [J].
BACCELLI, F ;
MASSEY, WA ;
TOWSLEY, D .
JOURNAL OF THE ACM, 1989, 36 (03) :615-642
[3]   THE FORK-JOIN QUEUE AND RELATED SYSTEMS WITH SYNCHRONIZATION CONSTRAINTS - STOCHASTIC ORDERING AND COMPUTABLE BOUNDS [J].
BACCELLI, F ;
MAKOWSKI, AM ;
SHWARTZ, A .
ADVANCES IN APPLIED PROBABILITY, 1989, 21 (03) :629-660
[4]  
Baccelli F, 1992, SYNCHRONIZATION LINE
[5]  
BAI X, 1990, P IEEE CHMT IEMT S, P312
[6]  
BRONDSTED A, 1983, INTRO CONVEX POLYTOP
[7]  
DAVIS PJ, 1975, METHODS NUMERICAL IN
[8]   CONWIP ASSEMBLY WITH DETERMINISTIC PROCESSING AND RANDOM OUTAGES [J].
DUENYAS, I ;
HOPP, WJ .
IIE TRANSACTIONS, 1992, 24 (04) :97-109
[9]   RELEASE POLICIES FOR ASSEMBLY SYSTEMS [J].
DUENYAS, I ;
KEBLIS, MF .
IIE TRANSACTIONS, 1995, 27 (04) :507-518
[10]   ESTIMATING THE THROUGHPUT OF A CYCLIC ASSEMBLY SYSTEM [J].
DUENYAS, I .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (06) :1403-1419