Ensuring responsive capacity: How to contract with backup suppliers

被引:42
作者
Sting, Fabian J. [1 ]
Huchzermeier, Arnd [2 ]
机构
[1] INSEAD, F-77305 Fontainebleau, France
[2] WHU Otto Beisheim Sch Management, D-56179 Vallendar, Germany
关键词
Responsive capacity; Demand and supply uncertainty; Supply chain contracting; Operational hedging; Backup supplier; CHAIN; INVESTMENT; DEMAND; FLEXIBILITY; PROCUREMENT; STRATEGIES; MODEL; RISK;
D O I
10.1016/j.ejor.2010.05.044
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Firms that source from offshore plants frequently perceive the lack of reliability and flexibility to be among the major drawbacks of their strategy. To mitigate against imminent mismatches of uncertain supply and demand, establishing capacity hedges in the form of responsive backup suppliers is a way out that many firms follow. This article analyzes how firms should contract with backup suppliers, inducing the latter to install responsive capacity. We show that supply options are appropriate to achieve sourcing channel coordination under forced compliance, whereas any firm commitment contract imposes a deadweight loss on the system. Whereas price-only contracts are unable to coordinate the sourcing channel under voluntary compliance, utilization-dependent price-only contracts are. Under the former contract, a price-focused strategy on the part of the manufacturer turns out to diminish the system's service level and possibly has negative implications on installed backup capacity, and not least on the manufacturer's profit. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:725 / 735
页数:11
相关论文
共 31 条
[1]  
[Anonymous], NAVAL RES LOGISTICS
[2]  
[Anonymous], 2003, HDB OPERATIONS RES M
[3]   Vulnerable options in supply chains: Effects of supplier competition [J].
Babich, Volodymyr .
NAVAL RESEARCH LOGISTICS, 2006, 53 (07) :656-673
[4]   Contracting to assure supply: How to share demand forecasts in a supply chain [J].
Cachon, GP ;
Lariviere, MA .
MANAGEMENT SCIENCE, 2001, 47 (05) :629-646
[5]  
Chopra S, 2004, MIT SLOAN MANAGE REV, V46, P53
[6]  
Christopher M., 2004, Building the resilient supply chain, DOI [10.1108/09574090410700275, DOI 10.1108/09574090410700275]
[7]   A PERIODIC REVIEW, PRODUCTION PLANNING-MODEL WITH UNCERTAIN CAPACITY AND UNCERTAIN DEMAND - OPTIMALITY OF EXTENDED MYOPIC POLICIES [J].
CIARALLO, FW ;
AKELLA, R ;
MORTON, TE .
MANAGEMENT SCIENCE, 1994, 40 (03) :320-332
[8]   A newsvendor's procurement problem when suppliers are unreliable [J].
Dada, Maqbool ;
Petruzzi, Nicholas C. ;
Schwarz, Leroy B. .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2007, 9 (01) :9-32
[9]   Efficient supply contracts for fashion goods with forecast updating and two production modes [J].
Donohue, KL .
MANAGEMENT SCIENCE, 2000, 46 (11) :1397-1411
[10]  
Hayes R., 2005, OPERATIONS STRATEGY