A review of scheduling research involving setup considerations

被引:645
作者
Allahverdi, A
Gupta, JND
Aldowaisan, T
机构
[1] Kuwait Univ, Dept Mech & Ind Engn, Safat, Kuwait
[2] Ball State Univ, Dept Management, Muncie, IN 47306 USA
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 1999年 / 27卷 / 02期
关键词
machine and shop scheduling; setup times; setup cost; review of problems and algorithms;
D O I
10.1016/S0305-0483(98)00042-5
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The majority of scheduling research assumes setup as negligible or part of the processing time. While this assumption simplifies the analysis and/or reflects certain applications, it adversely affects the solution quality for many applications which require explicit treatment of setup. Such applications, coupled with the emergence of production concepts like time-based competition and group technology, have motivated increasing interest to include setup considerations in scheduling problems. This paper provides a comprehensive review of the literature on scheduling problems involving setup times (costs). It classifies scheduling problems into batch and non-batch, sequence-independent and sequence-dependent setup, and categorizes the literature according to the shop environments of single machine, parallel machines, flowshops, and job shops. The suggested classification scheme organizes the scheduling literature involving setup considerations, summarizes the current research results for different problem types, and finally provides guidelines for future research. (C) 1999 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:219 / 239
页数:21
相关论文
共 199 条
[1]   SINGLE FACILITY MULTICLASS JOB SCHEDULING [J].
AHN, BH ;
HYUN, JH .
COMPUTERS & OPERATIONS RESEARCH, 1990, 17 (03) :265-272
[2]   Total flowtime in no-wait flowshops with separated setup times [J].
Aldowaisan, T ;
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (09) :757-765
[3]   Scheduling in stochastic flowshops with independent setup, processing and removal times [J].
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (10) :955-960
[4]  
ALLAHVERDI A, 1995, J OPER RES SOC, V46, P896, DOI 10.2307/2583973
[5]  
ALLAHVERDI A, UNPUB COMPUT OPER RE
[6]  
ALLAHVERDI A, IN PRESS J OPER RES
[7]  
[Anonymous], ANNOTATED BIBLIOGRAP
[8]   ON N/1/FBAR SETUP DEPENDENT PROBLEMS [J].
ARCELUS, FJ ;
CHANDRA, R .
ENGINEERING OPTIMIZATION, 1983, 7 (01) :59-67
[9]   Single machine scheduling using dominance relation to minimize earliness subject to ready and due times [J].
Asano, M ;
Ohta, H .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1996, 44 (1-2) :35-43
[10]   DETERMINING LOT SIZES AND RESOURCE REQUIREMENTS - A REVIEW [J].
BAHL, HC ;
RITZMAN, LP ;
GUPTA, JND .
OPERATIONS RESEARCH, 1987, 35 (03) :329-345