Make-to-order policies for a stochastic lot-sizing problem using overtime

被引:10
作者
Dellaert, NP [1 ]
Meio, MT [1 ]
机构
[1] Erasmus Univ, Inst Econometr, NL-3000 DR Rotterdam, Netherlands
关键词
make-to-order manufacturing; lot-sizing; overtime work; heuristics;
D O I
10.1016/S0925-5273(98)00053-X
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We address a stochastic single item production system in a make-to-order environment where customer orders receive a promised delivery date upon arrival. Capacity is reserved for the production of the item but can be extended by working overtime. The problem consists of determining the optimal size of a production lot, so that delivery promises are met on time at the expense of minimal average costs. These include setup costs, holding costs for orders that are finished before their promised delivery date and penalty costs for orders that are not satisfied on time and are therefore backordered. Also, the use of capacity beyond the regularly available incurs overtime costs. Given that the optimal policy is likely to be too complex in most practical situations, we propose four different strategies for obtaining production lot sizes. Three of the rules are based on the well-known (s, S) and (R, S) policies for make-to-stock problems while the fourth strategy is motivated by a rule originally derived for a similar problem with unlimited production capacity. An extensive numerical study indicates the conditions under which each lot-sizing rule shows the best performance. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:79 / 97
页数:19
相关论文
共 23 条
[1]   OVERTIME DECISION RULE EXPERIMENTS WITH A MODEL OF A REAL SHOP [J].
ADSHEAD, NS ;
PRICE, DHR .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 39 (03) :274-283
[2]   A CYCLICAL SCHEDULING HEURISTIC FOR LOT SIZING WITH CAPACITY CONSTRAINTS [J].
BAHL, HC ;
RITZMAN, LP .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (05) :791-800
[3]   DETERMINING LOT SIZES AND RESOURCE REQUIREMENTS - A REVIEW [J].
BAHL, HC ;
RITZMAN, LP ;
GUPTA, JND .
OPERATIONS RESEARCH, 1987, 35 (03) :329-345
[4]  
Blackburn J. D., 1980, Decision Sciences, V11, P691, DOI 10.1111/j.1540-5915.1980.tb01170.x
[5]   SERVICE CONSTRAINED (S, S) INVENTORY SYSTEMS WITH PRIORITY DEMAND CLASSES AND LOST SALES [J].
COHEN, MA ;
KLEINDORFER, PR ;
LEE, HL .
MANAGEMENT SCIENCE, 1988, 34 (04) :482-499
[6]   HEURISTIC PROCEDURES FOR A STOCHASTIC LOT-SIZING PROBLEM IN MAKE-TO-ORDER MANUFACTURING [J].
DELLAERT, NP ;
MELO, MT .
ANNALS OF OPERATIONS RESEARCH, 1995, 59 :227-258
[7]   Production strategies for a stochastic lot-sizing problem with constant capacity [J].
Dellaert, NP ;
Melo, MT .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 92 (02) :281-301
[8]  
DELLAERT NP, 1985, OPERATIONS RES P, P247
[9]  
DELLAERT NP, 1989, LECT NOTES EC MATH S, V333
[10]  
GORHAM T, 1963, PRODUCTION INVENTORY, V9, P75