Simulation analysis of a manufacturing supply chain

被引:64
作者
Bhaskaran, S [1 ]
机构
[1] GM Corp, R&D Ctr, Dept Operat Res, Warren, MI 48090 USA
关键词
Kanban; MRP; multiechelon production inventory control; push and pull material control; simulation analysis; and supply chain management;
D O I
10.1111/j.1540-5915.1998.tb01357.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A supply chain is a series of manufacturing plants that transform raw material into finished product. A pipeline within a supply chain refers to the stream of information, material, components, and assemblies that are associated with a particular product. It is typical for manufacturing plants to put considerable effort to optimize the performance of a horizontal slice of a supply chain (such as coordination among parts that share a common resource). The need to optimize the performance of the vertical slice (the supply chain connecting raw material to finished product) by controlling the transmission of schedule instability and the resulting inventory fluctuation is often overlooked. A schedule is stable if actual production requirements for a given period do not change from the forecast production requirements. Stable production schedules are important when managing supply chains as they help control inventory fluctuation and inventory accumulation. Failure to control schedule instability results in high average inventory levels in the system. In this paper a simulation analysis of supply chain instability and inventory is conducted, and it is shown how supply chains can be analyzed for continuous improvement opportunities using simulation. The focus is on a stamping pipeline in an automobile supply chain based on operating data from General Motors (GM). It is shown that the techniques used in this paper are a useful tool for supply chain analysis.
引用
收藏
页码:633 / 657
页数:25
相关论文
共 14 条
[1]   INSTALLATION VS ECHELON STOCK POLICIES FOR MULTILEVEL INVENTORY CONTROL [J].
AXSATER, S ;
ROSLING, K .
MANAGEMENT SCIENCE, 1993, 39 (10) :1274-1280
[2]   MULTILEVEL PRODUCTION-INVENTORY CONTROL - MATERIAL REQUIREMENTS PLANNING OR REORDER POINT POLICIES [J].
AXSATER, S ;
ROSLING, K .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 75 (02) :405-412
[3]  
GRAVES SC, 1994, DYANIC MODEL REQUIRE
[4]   MODELING THE EVOLUTION OF DEMAND FORECASTS WITH APPLICATION TO SAFETY STOCK ANALYSIS IN PRODUCTION DISTRIBUTION-SYSTEMS [J].
HEATH, DC ;
JACKSON, PL .
IIE TRANSACTIONS, 1994, 26 (03) :17-30
[5]  
Houlihan J.B., 1987, International Journal of Physical Distribution and Logistics Management, V19, P51
[6]   DESIGN AND ANALYSIS OF PULL SYSTEM, A METHOD OF MULTISTAGE PRODUCTION CONTROL [J].
KIMURA, O ;
TERADA, H .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1981, 19 (03) :241-253
[7]   SOME WAYS TO INCREASE FLEXIBILITY IN MANUFACTURING SYSTEMS [J].
MURAMATSU, R ;
ISHII, K ;
TAKAHASHI, K .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1985, 23 (04) :691-703
[8]   TESTING BEHAVIORAL SIMULATION-MODELS BY DIRECT EXPERIMENT [J].
STERMAN, JD .
MANAGEMENT SCIENCE, 1987, 33 (12) :1572-1592
[9]   ANALYSIS OF PRODUCTION ORDERING QUANTITIES AND INVENTORY VARIATIONS IN A MULTISTAGE PRODUCTION ORDERING SYSTEM [J].
TABE, T ;
MURAMATSU, R ;
TANAKA, Y .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1980, 18 (02) :245-257
[10]   FEEDBACK METHOD OF PRODUCTION ORDERING SYSTEM IN MULTISTAGE PRODUCTION AND INVENTORY SYSTEMS [J].
TAKAHASHI, K ;
MURAMATSU, R ;
ISHII, K .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1987, 25 (06) :925-941