Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain

被引:39
作者
Sahin, Funda [1 ]
Robinson, E. Powell [2 ]
Gao, Li-Lian [3 ]
机构
[1] Univ Tennessee, Coll Business Adm, Dept Mkt & Logist, Knoxville, TN 37996 USA
[2] Texas A&M Univ, Mays Business Sch, Dept Informat & Operat Management, College Stn, TX 77843 USA
[3] Hofstra Univ, Frank G Zarb Sch Business, Dept Management Entrepreneurship & Gen Business, Hempstead, NY 11549 USA
关键词
Master production scheduling; Materials requirement planning; Supply chain management; Simulation;
D O I
10.1016/j.ijpe.2008.05.019
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research studies master production schedule (MPS) and advanced order commitment (AOC) in two-stage supply chains. Experimental analysis, based on computer simulation, evaluates the impact of environmental and MPS design factors on optimal policy design as measured by schedule cost and stability. The vendor's order-size flexibility is the major factor impacting system performance. The manufacturer's optimal MPS policy is often inefficient for the vendor, resulting in total costs significantly greater than the optimal system policy. The research provides insight into the dynamic nature of scheduling and procurement systems and how they can be better coordinated through the MPS/AOC policy design. (c) Published by Elsevier B.V.
引用
收藏
页码:528 / 541
页数:14
相关论文
共 49 条
[1]  
[Anonymous], J OPERATIONS MANAGEM
[2]  
Baker K.R., 1977, DECISION SCI, V8, P19, DOI [DOI 10.1111/J.1540-5915.1977.TB01065.X, 10.1111/j.1540-5915.1977.tb01065.x]
[3]  
Blackburn J. D., 1980, Decision Sciences, V11, P691, DOI 10.1111/j.1540-5915.1980.tb01170.x
[4]   A COMPARISON OF STRATEGIES TO DAMPEN NERVOUSNESS IN MRP SYSTEMS [J].
BLACKBURN, JD ;
KROPP, DH ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1986, 32 (04) :413-429
[5]   IMPROVED HEURISTICS FOR MULTISTAGE REQUIREMENTS PLANNING SYSTEMS [J].
BLACKBURN, JD ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1982, 28 (01) :44-56
[6]  
Blackburn JD., 1982, J OPERATIONS MANAGEM, V2, P125, DOI [10.1016/0272-6963(82)90028-6, DOI 10.1016/0272-6963(82)90028-6]
[7]   ROLLING HORIZON PRODUCTION PLANNING FOR PROBABILISTIC TIME-VARYING DEMANDS [J].
BOOKBINDER, JH ;
HNG, BT .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (06) :1439-1458
[8]   AN ANALYSIS OF TRANSFORMATIONS [J].
BOX, GEP ;
COX, DR .
JOURNAL OF THE ROYAL STATISTICAL SOCIETY SERIES B-STATISTICAL METHODOLOGY, 1964, 26 (02) :211-252
[9]   MASTER PRODUCTION SCHEDULING UNDER ROLLING PLANNING-HORIZONS WITH FIXED ORDER INTERVALS [J].
CAMPBELL, GM .
DECISION SCIENCES, 1992, 23 (02) :312-331
[10]  
Carlson R. C., 1982, Decision Sciences, V13, P129, DOI 10.1111/j.1540-5915.1982.tb00136.x