Modeling and analysis of build-to-order supply chains

被引:67
作者
Gunasekaran, Angappa [1 ]
Ngai, Eric W. T. [2 ]
机构
[1] Univ Massachusetts, Dept Informat & Decis Sci, N Dartmouth, MA 02747 USA
[2] Hong Kong Polytech Univ, Dept Management & Mkt, Kowloon, Hong Kong, Peoples R China
关键词
BTO/MTO; Supply chain; Modeling; Review; Future research; DELAYED PRODUCT DIFFERENTIATION; LEAD TIMES; SYSTEMS; MANAGEMENT; DESIGN; PERFORMANCE; LOGISTICS; INVENTORY; DELIVERY; INFORMATION;
D O I
10.1016/j.ejor.2008.03.026
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The build-to-order supply chain (BTO-SC) or make-to-order (MTO) system has received a great deal of attention in recent years because of the success of high-tech companies such as Dell, BMW, Compaq, and Gateway. Some auto companies have also implemented BTO-SC. Quite a few research articles have been written on BTO-SC and MTC. However. those that explicitly address the problems of BTO-SCM with modeling are rather limited in number. Considering the growing importance of more informed and timely decision making in these areas, there is a need to encourage further research on the modeling and analysis of global Outsourcing, optimization between product variants and the cost of production, the point of differentiation along the production/assembly process, the selection of suppliers, logistics costs, and Customer relationship management. Traditional operations research models have been used to solve supply chain management problems. Considering the importance of BTO or MTO, an attempt has been made to review the selected literature on the modeling and analysis of BTO-SC with the objectives of providing assistance to and motivating both researchers and practitioners to design, develop, and manage BTO-SC effectively; and suggesting some future research directions on BTO supply chain management (BTO-SCM). The literature available on BTO-SCM has been classified based on the nature of the decision-making areas and then sub-classified to focus on solving problems with modeling and analysis. We have focused mostly on the modeling aspect of the BTO-SC, but have not extended our efforts to empirical research. We have developed a unified framework for modeling and analyzing BTO-SCM and suggest some future research directions. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:319 / 334
页数:16
相关论文
共 49 条
[1]   Modeling the metrics of lean, agile and leagile supply chain: An ANP-based approach [J].
Agarwal, Ashish ;
Shankar, Ravi ;
Tiwari, M. K. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 173 (01) :211-225
[2]  
[Anonymous], 2000, European Journal of Purchasing & Supply Management, DOI DOI 10.1016/S0969-7012(99)00016-1
[3]  
[Anonymous], 2001, European, DOI [10.1016/S0969-7012, DOI 10.1016/S0969-7012]
[4]   The effect of collaborative forecasting on supply chain performance [J].
Aviv, Y .
MANAGEMENT SCIENCE, 2001, 47 (10) :1326-1343
[5]   On the benefits of collaborative forecasting partnerships between retailers and manufacturers [J].
Aviv, Yossi .
MANAGEMENT SCIENCE, 2007, 53 (05) :777-794
[6]   Production planning with flexible product specifications: An application to specialty steel manufacturing [J].
Balakrishnan, A ;
Geunes, J .
OPERATIONS RESEARCH, 2003, 51 (01) :94-112
[7]   Object oriented modeling and decision support for supply chains [J].
Biswas, S ;
Narahari, Y .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 153 (03) :704-726
[8]   Lean launch: Managing product introduction risk through response-based logistics [J].
Bowersox, DJ ;
Stank, TP ;
Daugherty, PJ .
JOURNAL OF PRODUCT INNOVATION MANAGEMENT, 1999, 16 (06) :557-568
[9]   Quantifying the bullwhip effect in a simple supply chain: The impact of forecasting, lead times, and information [J].
Chen, F ;
Drezner, Z ;
Ryan, JK ;
Simchi-Levi, D .
MANAGEMENT SCIENCE, 2000, 46 (03) :436-443
[10]   A staggered ordering policy for one-warehouse, multiretailer systems [J].
Chen, FR ;
Samroengraja, R .
OPERATIONS RESEARCH, 2000, 48 (02) :281-293