共 18 条
[5]
Supply chain coordination with controllable lead time and asymmetric information[J] . Yina Li,Xuejun Xu,Xiande Zhao,Jeff Hoi Yan Yeung,Fei Ye.European Journal of Operational Research . 2011 (1)
[6]
Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period[J] . Ali Arkan,Seyed Reza Hejazi.Computers & Industrial Engineering . 2011 (1)
[7]
The optimal integrated inventory policy with price-and-credit-linked demand under two-level trade credit[J] . Chia-Huei Ho.Computers & Industrial Engineering . 2010 (1)
[9]
Managing multi-echelon multi-item channels with trade allowances under credit period[J] . Yu-Chung Tsao.International Journal of Production Economics . 2009 (2)
[10]
Integrated inventory models considering the two-level trade credit policy and a price-negotiation scheme[J] . Liang-Hsuan Chen,Fu-Sen Kang.European Journal of Operational Research . 2009 (1)