An integrated model for order release and due-date demand management

被引:1
作者
Saad, Sameh M. [1 ]
Pickett, N. [2 ]
Kittiaram, K. [3 ]
机构
[1] Advanced Manufacturing Systems, School of Engineering, Sheffield Hallam University, Sheffield
[2] Engineering Design, School of Engineering, Sheffield Hallam University, Sheffield
[3] School of Engineering, Sheffield Hallam University, Sheffield
关键词
Demand management; Order processing; Schedule based ordering;
D O I
10.1108/09576060410512356
中图分类号
学科分类号
摘要
In this paper, an integrated model for order release and due-date management is developed to enhance manufacturers' confidence in the due-dates offered to customers. The proposed model utilised the backward finite scheduling order release control method and five different due-date assignment rules. The proposed model is implemented using C++ computer programming language. Due-date of each order is calculated by a due-date assignment rule selected. Then the program tries to schedule the whole order with as lowest value as possible of tightness parameter (k). The output of the C++ program is production schedule of the whole order using backward finite scheduling order release method. Experiment results indicate that the modified number of operations due-date rule_-MNOP is superior with respect to the other due-dates rules of the whole order.
引用
收藏
页码:76 / 89
页数:13
相关论文
共 15 条
[1]  
Baker K.R., Sequencing rules and due-date assignments in a job shop, Management Science, 30, 9, (1984)
[2]  
Baker K.R., Scudder G.D., Sequencing with earliness and tardiness penalties, Operations Research, 38, 1, (1990)
[3]  
Bobrowski P.M., Work release strategies in a dual resource constrained job shop, OMEGA International Journal of Management Science, 17, 2, (1989)
[4]  
Bobrowski P.M., Park P.S., Work release strategies in a dual resource constrained job shop, OMEGA International Journal of Management Science, 17, 2, (1989)
[5]  
Eilon S., Chowdhury I.G., Due-dates in job shop scheduling, International Journal of Production Research, 14, 2, (1976)
[6]  
Eilon S., Hodgson R.M., Job shop scheduling with due-dates, International Journal of Production Research, 6, 1, pp. 1-15, (1967)
[7]  
Feng-Chang R.C., A study of due-date assignment rules with constrained tightness in a dynamic job shop, Computers Industrial Engineering, 31, 1-2, (1996)
[8]  
Gindy N.N., Saad S.M., Yue Y., Manufacturing responsiveness through integrated process planning and scheduling, International Journal of Production Research, 37, 11, (1999)
[9]  
Melnyk S.A., Ragatz G.L., Order review/release: Research issues and perspectives, International Journal of Production Research, 27, 7, (1989)
[10]  
Philipoom P.R., Fry T.D., Capacity-based order review/ release strategies to improve manufacturing performance, International Journal of Production Research, 30, 11, (1992)