AN ALGORITHM FOR THE CON DUE-DATE DETERMINATION AND SEQUENCING PROBLEM

被引:37
作者
CHENG, TCE
机构
[1] LOUGHBOROUGH UNIV TECHNOL,LOUGHBOROUGH LE11 3TU,LEICS,ENGLAND
[2] NATL UNIV SINGAPORE,SINGAPORE 0511,SINGAPORE
[3] CHINESE UNIV HONG KONG,SHATIN,HONG KONG
关键词
D O I
10.1016/0305-0548(87)90048-7
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:537 / 542
页数:6
相关论文
共 14 条
[1]  
AMHED MU, 1984, P TIMS SE CHAPTER M, P38
[2]  
CHENG TCE, 1984, J OPER RES SOC, V35, P433
[3]  
CHENG TCE, 1983, 7TH P INT C PROD RES
[4]  
CHENG TCE, 1983, P AIIE A C KY
[5]  
CHENG TCE, 1985, ENG OPTIM, V9, P127, DOI DOI 10.1080/03052158508902508
[6]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P228
[7]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[8]  
Jackson J.R., 1955, MANAGEMENT SCI RES P
[10]   COMMON DUE DATE ASSIGNMENT TO MINIMIZE TOTAL PENALTY FOR THE ONE MACHINE SCHEDULING PROBLEM [J].
PANWALKAR, SS ;
SMITH, ML ;
SEIDMANN, A .
OPERATIONS RESEARCH, 1982, 30 (02) :391-399