ONE-MACHINE SEQUENCING TO MINIMIZE CERTAIN FUNCTIONS OF JOB TARDINESS

被引:220
作者
EMMONS, H
机构
关键词
D O I
10.1287/opre.17.4.701
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Problems of sequencing n jobs on one machine to minimize total tardiness are discussed; theorems that establish relative order in which pairs of jobs are processed in optimal schedule are proved; results are partly extended to more general criterion of minimizing sum of identical, convex, nondecreasing functions of job tardiness and efficient algorithm is proposed.
引用
收藏
页码:701 / &
相关论文
共 7 条
[1]  
Conway R. W., 1967, THEORY SCHEDULING
[2]  
ELMAGHRABY SE, 1968, J IND ENGINEERING, V19, P105
[3]  
HELD M, 1962, SIAM J, V10, P196
[4]   ON SCHEDULING PROBLEMS WITH DEFERRAL COSTS [J].
LAWLER, EL .
MANAGEMENT SCIENCE, 1964, 11 (02) :280-288
[5]   SCHEDULING WITH DEADLINES AND LOSS FUNCTIONS ON K PARALLEL MACHINES [J].
ROOT, JG .
MANAGEMENT SCIENCE, 1965, 11 (03) :460-475
[6]   ON SCHEDULING TASKS WITH ASSOCIATED LINEAR LOSS FUNCTIONS [J].
SCHILD, A ;
FREDMAN, IJ .
MANAGEMENT SCIENCE, 1961, 7 (03) :280-285
[7]  
Smith W. E., 1956, NAV RES LOGIST Q, V3, P59, DOI DOI 10.1002/NAV.3800030106