ESTIMATING SIMULATION METAMODEL PARAMETERS FOR UNEXPECTED SHOP FLOOR REAL-TIME EVENTS

被引:11
作者
LIN, L [1 ]
COCHRAN, JK [1 ]
机构
[1] ARIZONA STATE UNIV,DEPT IND & MANAGEMENT SYST ENGN,TEMPE,AZ 85287
关键词
D O I
10.1016/0360-8352(90)90078-Z
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In order to better understand assembly line system dynamic behavior and provide a basis for developing effective production controls, three unexpected real time events are studied, including sudden machine breakdown at a work station, parts supply shortage and high priority job order processing. Short term system performance is evaluated by dynamic response variables associated with assembly time and work in process (WIP) inventory. Simulation is used as the modeling tool, and the results are further described by mathematical metamodels for overall system behavior. The system transients can be adequately represented by first order exponential functions, and satisfactory results are also obtained for expressing simultaneous occurrence of dynamic events by combined metamodels using linear additivity. A procedure is proposed for the development of dynamic metamodels. For a given system, only a limited number of simulation runs should be made in advance to estimate the metamodel parameters. Using the resultant application program that only contains the metamodels, whenever an event occurs, without running simulation a user can instantaneously predict the consequence in a specified time period by an estimation to the number of assembly products to be finished late.
引用
收藏
页码:62 / 66
页数:5
相关论文
共 13 条
[1]  
BENNER W, 1989, COMMUNICATION
[2]   MODELLING MANUFACTURING SYSTEMS. [J].
Buzacott, J.A. .
Robotics and Computer-Integrated Manufacturing, 1985, 2 (01) :25-32
[3]   THE METAMODEL IN SIMULATION ANALYSIS - CAN IT BE TRUSTED [J].
FRIEDMAN, LW ;
PRESSMAN, I .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1988, 39 (10) :939-948
[4]  
Gross D, 1985, FUNDAMENTALS QUEUING, V3rd
[5]   A COMPUTER-SIMULATION STUDY OF MANUAL FLOW LINES [J].
HIRA, DS ;
PANDEY, PC .
JOURNAL OF MANUFACTURING SYSTEMS, 1983, 2 (02) :117-125
[6]  
KLEIJNEN JPC, 1979, IEEE T SYST MAN CYB, V9, P93
[7]   OPTIMIZATION OF A COMPLEX FLOW LINE FOR PRINTED-CIRCUIT BOARD FABRICATION BY COMPUTER-SIMULATION [J].
LIN, L ;
COCHRAN, JK .
JOURNAL OF MANUFACTURING SYSTEMS, 1987, 6 (01) :47-57
[8]  
LIN L, IN PRESS INT J PRODU
[9]  
LIN L, 1989, THESIS ARIZONA STATE
[10]  
MAINON OZ, 1987, J MANUF SYST, V6, P125