DYNAMIC-PROGRAMMING STATE-SPACE RELAXATION FOR SINGLE-MACHINE SCHEDULING

被引:105
作者
ABDULRAZAQ, TS
POTTS, CN
机构
[1] Univ of Keele, UK, Univ of Keele, UK
关键词
D O I
10.1057/jors.1988.26
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
8
引用
收藏
页码:141 / 152
页数:12
相关论文
共 8 条
[1]   STATE-SPACE RELAXATION PROCEDURES FOR THE COMPUTATION OF BOUNDS TO ROUTING-PROBLEMS [J].
CHRISTOFIDES, N ;
MINGOZZI, A ;
TOTH, P .
NETWORKS, 1981, 11 (02) :145-164
[2]   DUAL ALGORITHM FOR ONE-MACHINE SCHEDULING PROBLEM [J].
FISHER, ML .
MATHEMATICAL PROGRAMMING, 1976, 11 (03) :229-251
[3]   A DYNAMIC PROGRAMMING APPROACH TO SEQUENCING PROBLEMS [J].
HELD, M ;
KARP, RM .
JOURNAL OF THE SOCIETY FOR INDUSTRIAL AND APPLIED MATHEMATICS, 1962, 10 (01) :196-210
[4]  
Held M., 1974, Mathematical Programming, V6, P62, DOI 10.1007/BF01580223
[5]  
LAWLER EL, 1979, BW106 MATH CENTR REP
[6]   A BRANCH AND BOUND ALGORITHM FOR THE TOTAL WEIGHTED TARDINESS PROBLEM [J].
POTTS, CN ;
VANWASSENHOVE, LN .
OPERATIONS RESEARCH, 1985, 33 (02) :363-377
[7]   MINIMIZING TOTAL COSTS IN ONE-MACHINE SCHEDULING [J].
RINNOOYKAN, AHG ;
LAGEWEG, BJ ;
LENSTRA, JK .
OPERATIONS RESEARCH, 1975, 23 (05) :908-927
[8]   DYNAMIC-PROGRAMMING SOLUTION OF SEQUENCING PROBLEMS WITH PRECEDENCE CONSTRAINTS [J].
SCHRAGE, L ;
BAKER, KR .
OPERATIONS RESEARCH, 1978, 26 (03) :444-449